(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Timing Pulleys - High Torque, P5M Series.

Timing Pulleys - High Torque, P5M Series.
  • Lead Time Reduction

New: Available number of teeth increased on metric pulleys. [August 2023]

  • METRIC
  • inCAD Components

(i)Caution

  • Please note that the swaged flange options, NFC, RFC, and LFC, are not reflected in the CAD data.

[ ! ]For Keyway Dimension Details, see >> Click here
・Materials
Part Number[ M ]Material[ S ]Surface Treatment[ A ]Accessories
Set Screws
Belt Width 10mmBelt Width 15mmPulleyFlange
A: 11.6 W: 16 L: 28A: 16.6 W: 21 L: 33
PTPA_ _P5M100PTPA_ _P5M1502000 Series Aluminum AlloyAluminum AlloyClear Anodize304 Stainless Steel
PTPB_ _P5M100PTPB_ _P5M150Black Anodize
PTPK_ _P5M100PTPK_ _P5M150Hard Clear Anodize*
PTPN_ _P5M100PTPN_ _P5M150Electroless Nickel Plating
PTPM_ _P5M100PTPM_ _P5M1501045 Carbon Steel
or Equivalent
Low Carbon SteelBlack Oxide4137 Alloy Steel
(Black Oxide)
PTPP_ _P5M100PTPP_ _P5M150Electroless Nickel Plating
[ ! ]Flange is installed, and set screws are included with shaft bore specifications P, N and C.
*Hard Anodize Treatment: Film Hardness 300HV~
 

Specifications

 Part Number-Pulley Shape-Shaft Bore Spec., I.D.-Z-J-Q-R-S-T
(Shaft Bore Specs.: H, P, N, C)PTPA20P5M150-A-NK10 Z29 J22        
(Shaft Bore Specs: V, F)PTPA60P5M100-B-V20--        
(Shaft Bore Specs: Y)PTPA36P5M150-A-Y17  -Q30-R30-S7-T7

Alterations

Part Number 

CAD Data download and 3D preview are not available because the part number has not yet been determined.

  • *In order to open the CAD Data download and 3D preview screen, the part number must be fixed.
  • Please confirm the part number from "Specification / Dimension"on the left side, and then perform the CAD Data Download / 3D Preview operation.
Loading...
Part Number
PTPN12P5M100-A-H[5-6/1]
PTPN12P5M100-A-P[5-6/1]
PTPN12P5M100-B-H[5-6/1]
PTPN12P5M100-B-P[5-6/1]
PTPN12P5M150-A-H[5-6/1]
PTPN12P5M150-A-P[5-6/1]
PTPN12P5M150-B-H[5-6/1]
PTPN12P5M150-B-P[5-6/1]
PTPN14P5M100-A-H[5-6/1]
PTPN14P5M100-A-P[5-6/1]
PTPN14P5M100-B-H[5-6/1]
PTPN14P5M100-B-P[5-6/1]
PTPN14P5M150-A-H[5-6/1]
PTPN14P5M150-A-P[5-6/1]
PTPN14P5M150-B-H[5-6/1]
PTPN14P5M150-B-P[5-6/1]
PTPN15P5M100-A-H6.35
PTPN15P5M100-A-H[5-10/1]
PTPN15P5M100-A-N8
PTPN15P5M100-A-P6.35
PTPN15P5M100-A-P[5-8/1]
PTPN15P5M100-B-H6.35
PTPN15P5M100-B-H[5-10/1]
PTPN15P5M100-B-N8
PTPN15P5M100-B-P6.35
PTPN15P5M100-B-P[5-8/1]
PTPN15P5M150-A-H6.35
PTPN15P5M150-A-H[5-10/1]
PTPN15P5M150-A-N8
PTPN15P5M150-A-P6.35
PTPN15P5M150-A-P[5-8/1]
PTPN15P5M150-B-H6.35
PTPN15P5M150-B-H[5-10/1]
PTPN15P5M150-B-N8
PTPN15P5M150-B-P6.35
PTPN15P5M150-B-P[5-8/1]
PTPN16P5M100-A-H6.35
PTPN16P5M100-A-H[5-10/1]
PTPN16P5M100-A-N8
PTPN16P5M100-A-P6.35
PTPN16P5M100-A-P[5-10/1]
PTPN16P5M100-B-H6.35
PTPN16P5M100-B-H[5-10/1]
PTPN16P5M100-B-N8
PTPN16P5M100-B-P6.35
PTPN16P5M100-B-P[5-10/1]
PTPN16P5M150-A-H6.35
PTPN16P5M150-A-H[5-10/1]
PTPN16P5M150-A-N8
PTPN16P5M150-A-P6.35
PTPN16P5M150-A-P[5-10/1]
PTPN16P5M150-B-H6.35
PTPN16P5M150-B-H[5-10/1]
PTPN16P5M150-B-N8
PTPN16P5M150-B-P6.35
PTPN16P5M150-B-P[5-10/1]
PTPN18P5M100-A-C10
PTPN18P5M100-A-H6.35
PTPN18P5M100-A-H[6-12/1]
PTPN18P5M100-A-N[8,​10,​11]
Part NumberMinimum order quantityVolume DiscountDays to Ship RoHSBelt Width Used(mm)
(mm)
Number of Teeth
(T)
Pulley Shape Material Surface Treatment 01.[H] Shaft Bore Spec. (Round Hole)
(mm)
02.[P] Shaft Bore Spec. (Round Hole + Tap)
(mm)
03.[N] Shaft Bore Spec. (New JIS Keyway Hole + Tap)
(mm)
04.[NK] Shaft Bore Spec. (Shaft Bore Dia. 10 Keyway Width 4mm Height 1.8mm) 05.[C] Shaft Bore Spec. (Old JIS Keyway Hole + Tap)
(mm)
06.[V] Shaft Bore Spec. (Stepped Hole)
(mm)
07.[F] Shaft Bore Spec. (Stepped Hole: Counterbored Holes on the Hub Side)
(mm)
08.[Y] Shaft Bore Spec. (Both Ends Stepped Hole)
(mm)
1 Piece(s)

16 Days or more

101012Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 6-------
1 Piece(s)

16 Days or more

101012Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 6------
1 Piece(s)

16 Days or more

101012Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 6-------
1 Piece(s)

16 Days or more

101012Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 6------
1 Piece(s)

16 Days or more

101512Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 6-------
1 Piece(s)

16 Days or more

101512Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 6------
1 Piece(s)

16 Days or more

101512Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 6-------
1 Piece(s)

16 Days or more

101512Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 6------
1 Piece(s)

16 Days or more

101014Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 6-------
1 Piece(s)

16 Days or more

101014Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 6------
1 Piece(s)

16 Days or more

101014Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 6-------
1 Piece(s)

16 Days or more

101014Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 6------
1 Piece(s)

16 Days or more

101514Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 6-------
1 Piece(s)

16 Days or more

101514Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 6------
1 Piece(s)

16 Days or more

101514Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 6-------
1 Piece(s)

16 Days or more

101514Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 6------
1 Piece(s)

16 Days or more

101015Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating6.35-------
1 Piece(s)

16 Days or more

101015Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 10-------
1 Piece(s)

16 Days or more

101015Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating--8-----
1 Piece(s)

16 Days or more

101015Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-6.35------
1 Piece(s)

16 Days or more

101015Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 8------
1 Piece(s)

16 Days or more

101015Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating6.35-------
1 Piece(s)

16 Days or more

101015Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 10-------
1 Piece(s)

16 Days or more

101015Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating--8-----
1 Piece(s)

16 Days or more

101015Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-6.35------
1 Piece(s)

16 Days or more

101015Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 8------
1 Piece(s)

16 Days or more

101515Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating6.35-------
1 Piece(s)

16 Days or more

101515Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 10-------
1 Piece(s)

16 Days or more

101515Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating--8-----
1 Piece(s)

16 Days or more

101515Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-6.35------
1 Piece(s)

16 Days or more

101515Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 8------
1 Piece(s)

16 Days or more

101515Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating6.35-------
1 Piece(s)

16 Days or more

101515Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 10-------
1 Piece(s)

16 Days or more

101515Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating--8-----
1 Piece(s)

16 Days or more

101515Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-6.35------
1 Piece(s)

16 Days or more

101515Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 8------
1 Piece(s)

16 Days or more

101016Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating6.35-------
1 Piece(s)

16 Days or more

101016Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 10-------
1 Piece(s)

16 Days or more

101016Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating--8-----
1 Piece(s)

16 Days or more

101016Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-6.35------
1 Piece(s)

16 Days or more

101016Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 10------
1 Piece(s)

16 Days or more

101016Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating6.35-------
1 Piece(s)

16 Days or more

101016Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 10-------
1 Piece(s)

16 Days or more

101016Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating--8-----
1 Piece(s)

16 Days or more

101016Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-6.35------
1 Piece(s)

16 Days or more

101016Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 10------
1 Piece(s)

16 Days or more

101516Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating6.35-------
1 Piece(s)

16 Days or more

101516Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 10-------
1 Piece(s)

16 Days or more

101516Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating--8-----
1 Piece(s)

16 Days or more

101516Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-6.35------
1 Piece(s)

16 Days or more

101516Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 10------
1 Piece(s)

16 Days or more

101516Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating6.35-------
1 Piece(s)

16 Days or more

101516Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating5 ~ 10-------
1 Piece(s)

16 Days or more

101516Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating--8-----
1 Piece(s)

16 Days or more

101516Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-6.35------
1 Piece(s)

16 Days or more

101516Shape B[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating-5 ~ 10------
1 Piece(s)

16 Days or more

101018Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating----10---
1 Piece(s)

16 Days or more

101018Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating6.35-------
1 Piece(s)

16 Days or more

101018Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating6 ~ 12-------
1 Piece(s)

16 Days or more

101018Shape A[Aluminum] Aluminum Alloy 2000 seriesElectroless Nickel Plating--8 ~ 11-----

Loading...

 

Basic Information

Type Timing Pulleys Belt Type P5M Timing Pulleys/Idlers Pulleys

Additional Products in this Category

Complementary Products

MISUMI Unit Example related to this product

Tech Support

Technical Support
Tel:+52-442-672-7661 ext. 2 then wait and dial 4
E-mail: soportetecnico@misumimex.com
Mon. - Fri. 8 a.m. - 6 p.m.