(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Post-Assembly Insertion Spring Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Buit-in Springs prevent the nuts from slipping off even inserted into the vertically-placed extrusions.
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Nut, Stopper Set for 5 Series Aluminum Extrusions
MISUMI
More inexpensive than when nuts and stoppers are purchased separately
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Insertion Nuts with Leaf Spring for 5 Series Aluminum Extrusions
MISUMI
Leaf spring is welded to the stopper nut. The nut will not fall if the extrusion is held vertically.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Pre-Assembly Fitting Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Please use HNST or SHNST as the stopper.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Pre-Assembly Fitting Spring Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Buit-in Springs prevent the nuts from slipping off even inserted into the vertically-placed extrusions.
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Nuts with Leaf Spring for 8 Series Aluminum Extrusions
MISUMI
Leaf spring is welded to the stopper nut. The nut will not fall if the extrusion is held vertically.
Days to Ship: | Same day or more |
---|
Show Stock Products
Pre-Assembly Insertion Short Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Can be mounted on a limited space.
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Short Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Please use this in combination with the Post-Assembly Insertion Stopper HNAST or HNBST.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
MISUMI
Can be mounted on a limited space.
Days to Ship: | 8 Days or more |
---|
Post-Assembly Nuts for 5 Series Aluminum Extrusions
MISUMI
Economically priced Post-Assembly Fitting Nuts with no stopper.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Pre-Assembly Insertion Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Please use HNST or SHNST as the stopper.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Insertion Short Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Can be mounted on a limited space.
Days to Ship: | Same day or more |
---|
Show Stock Products
Long Nuts for 5 Series Aluminum Extrusions - L Dimension Fixed
MISUMI
Long Nuts with standard length (L dimension).
Days to Ship: | 5 Days or more |
---|
Stopper Integrated Pre-Assembly Insertion Nuts for 6 Series Aluminum Extrusions
MISUMI
The plastic stopper and pre-assembly insertion nut are consolidated into one.
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Stoppers for 6 Series Aluminum Extrusions
MISUMI
•Series Name: 6 Series
•Surface Treatment: Trivalent Chromate
•Extrusion Series: HFS
•Extrusion No.: 6
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Nuts with Leaf Spring for 6 Series Aluminum Extrusions
MISUMI
Leaf spring is welded to the stopper nut. The nut will not fall if the extrusion is held vertically.
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Spring Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Buit-in Springs prevent the nuts from slipping off even inserted into the vertically-placed extrusions.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Fitting Spring Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Buit-in Springs prevent the nuts from slipping off even inserted into the vertically-placed extrusions.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Fitting Lock Nuts with Leaf Spring for8 Series Aluminum Extrusions
MISUMI
Leaf Spring-welded Lock Nuts allowing for easy positioning.
Special Price | |
Days to Ship: | Same day |
Show Stock Products
HFS5 Series, Pre-Assembly Insertion Screws for Square Aluminum Extrusion
MISUMI
This is Pre-Assembly Insertion Screw electrically conductive.
Days to Ship: | 8 Days or more |
---|
Square Nuts for 3 Series Aluminum Frames【100 Pieces Per Package】
MISUMI
Square Nuts available for 15mm square aluminum extrusions.
Days to Ship: | 8 Days or more |
---|
Pre-Assembly Stoppers for 5 Series Aluminum Extrusions
MISUMI
If used in combination with Pre-Assembly Insertion Nut, the stopper prevents the nut from slipping off even if the extrusion is positioned vertically.
Days to Ship: | Same day |
---|
Show Stock Products
Pre-Assembly Metal Stoppers for 5 Series Aluminum Extrusions
MISUMI
Stainless type stopper suitable for clean room use.
Days to Ship: | 8 Days or more |
---|
Stopper Integrated Pre-Assembly Insertion Nuts for 5 Series Aluminum Extrusions
MISUMI
The plastic stopper and pre-assembly insertion nut are consolidated into one!
Days to Ship: | Same day or more |
---|
Show Stock Products
Pre-Assembly Insertion Spring Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Buit-in Springs prevent the nuts from slipping off even inserted into the vertically-placed extrusions.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Pre-Assembly Insertion Lock Nuts for 5 Series Aluminum Extrusions
MISUMI
Tighten the included set screws to fix the position of nut.
Days to Ship: | 8 Days or more |
---|
Pre-Assembly Square Nuts for 5 Series Aluminum Extrusions【100 Pieces Per Package】
MISUMI
Economically Priced Sheet Metal Type of Iron Nut. Please use HNKKST as the stopper.
Days to Ship: | 8 Days or more |
---|
Stoppers for Pre-Assembly Square Nuts for 5 Series Aluminum Extrusions【100 Pieces Per Package】
MISUMI
Stoppers dedicated for Pre-Assembly Insertion Square Nut HNKK.
Days to Ship: | 8 Days or more |
---|
Post-Assembly Stopper Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Can be used in combination with the Post-Assembly Insertion Stopper HNAST or HNBST.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Stoppers for 5 Series Aluminum Extrusions
MISUMI
Prevents the post-assembly Insertion nuts from falling off even if an extrusion is placed vertically.
Days to Ship: | 8 Days or more |
---|
Post-Assembly Insertion Lock Nuts with Leaf Spring for 5 Series Aluminum Extrusions
MISUMI
Leaf Spring-welded Lock Nuts allowing for easy positioning.
Special Price | |
Days to Ship: | Same day |
Show Stock Products
Post-Assembly Insertion Lock Nuts for 5 Series Aluminum Extrusions
MISUMI
Included set screws make it possible to fix the position of nut
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Flanged Nuts for 5 Series Aluminum Extrusions
MISUMI
•Nut Type: Flanged Nuts
•Material: Stainless Steel
•Material: 304 Stainless Steel
•Type: Flanged Nuts
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Long Nuts for 5 Series Aluminum Extrusions - L Dimension Configurable
MISUMI
Length (L Dimension) Configurable Long Nuts. Length are specificable from 50 mm.
Days to Ship: | 8 Days or more |
---|
Pre-Assembly Insertion Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Please use HNST or SHNST as the stopper.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Pre-Assembly Stoppers for 6 Series Aluminum Extrusions
MISUMI
If used in combination with Pre-Assembly Insertion Nut, the stopper prevents the nut from slipping off even if the extrusion is positioned vertically.
Days to Ship: | Same day |
---|
Show Stock Products
Pre-Assembly Metal Stoppers for 6 Series Aluminum Extrusions
MISUMI
Stainless stopper suitable for clean room use.
Days to Ship: | 8 Days or more |
---|
Pre-Assembly Insertion Spring Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Buit-in Springs prevent the nuts from slipping off even inserted into the vertically-placed extrusions.
Days to Ship: | Same day or more |
---|
Show Stock Products
Pre-Assembly Insertion Lock Nuts for 6 Series Aluminum Extrusions
MISUMI
Included set screws make it possible to fix the position of nut
Days to Ship: | 8 Days or more |
---|
Pre-Assembly Insertion Short Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Can be mounted on a limited space.
Days to Ship: | Same day or more |
---|
Show Stock Products
Pre-Assembly Eccentric Nuts for 6 Series Aluminum Extrusions
MISUMI
Tapped Hole position is offset.
Days to Ship: | 8 Days or more |
---|
Pre-Assembly Square Nuts for 6 Series Aluminum Extrusions【100 Pieces Per Package】
MISUMI
Economically Priced Sheet Metal Type of Iron Nut. Please use HNKKST as the stopper.
Days to Ship: | 8 Days or more |
---|
Post-Assembly Insertion Nut, Stopper 6 Series Aluminum Extrusions
MISUMI
This is Post-Assembly Insertion Stopper Nut.
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Nut, Stopper Set for 6 Series Aluminum Extrusions, Polypropylene Stopper
MISUMI
Set product more inexpensive than when nuts and stoppers are purchased separately
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Nut, Stopper Set for 6 Series Aluminum Extrusions, Stainless Steel Stopper
MISUMI
Set product more inexpensive than when nuts and stoppers are purchased separately
Days to Ship: | 5 Days or more |
---|
Brand |
---|
Product Series |
CAD |
Days to Ship |
Specifications |
Nut Type |
Series Name |
Thread Nominal M(mm) |
Function |
Material |
Loosening Prevention |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||||||||||||||||||||
Brand | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI |
Product Series | Post-Assembly Insertion Spring Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Insertion Nut, Stopper Set for 5 Series Aluminum Extrusions | Post-Assembly Insertion Nuts with Leaf Spring for 5 Series Aluminum Extrusions | Pre-Assembly Fitting Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Pre-Assembly Fitting Spring Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Insertion Nuts with Leaf Spring for 8 Series Aluminum Extrusions | Pre-Assembly Insertion Short Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Insertion Short Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Pre-Assembly Insertion Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Insertion Short Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Long Nuts for 5 Series Aluminum Extrusions - L Dimension Fixed | Stopper Integrated Pre-Assembly Insertion Nuts for 6 Series Aluminum Extrusions | Post-Assembly Insertion Nuts with Leaf Spring for 6 Series Aluminum Extrusions | Post-Assembly Insertion Spring Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Fitting Spring Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Fitting Lock Nuts with Leaf Spring for8 Series Aluminum Extrusions | HFS5 Series, Pre-Assembly Insertion Screws for Square Aluminum Extrusion | Square Nuts for 3 Series Aluminum Frames【100 Pieces Per Package】 | Pre-Assembly Metal Stoppers for 5 Series Aluminum Extrusions | Stopper Integrated Pre-Assembly Insertion Nuts for 5 Series Aluminum Extrusions | Pre-Assembly Insertion Spring Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Pre-Assembly Insertion Lock Nuts for 5 Series Aluminum Extrusions | Pre-Assembly Square Nuts for 5 Series Aluminum Extrusions【100 Pieces Per Package】 | Stoppers for Pre-Assembly Square Nuts for 5 Series Aluminum Extrusions【100 Pieces Per Package】 | Post-Assembly Stopper Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Insertion Lock Nuts with Leaf Spring for 5 Series Aluminum Extrusions | Post-Assembly Insertion Lock Nuts for 5 Series Aluminum Extrusions | Long Nuts for 5 Series Aluminum Extrusions - L Dimension Configurable | Pre-Assembly Insertion Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Pre-Assembly Metal Stoppers for 6 Series Aluminum Extrusions | Pre-Assembly Insertion Spring Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Pre-Assembly Insertion Lock Nuts for 6 Series Aluminum Extrusions | Pre-Assembly Insertion Short Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Pre-Assembly Eccentric Nuts for 6 Series Aluminum Extrusions | Pre-Assembly Square Nuts for 6 Series Aluminum Extrusions【100 Pieces Per Package】 | Post-Assembly Insertion Nut, Stopper 6 Series Aluminum Extrusions | Post-Assembly Insertion Nut, Stopper Set for 6 Series Aluminum Extrusions, Polypropylene Stopper | Post-Assembly Insertion Nut, Stopper Set for 6 Series Aluminum Extrusions, Stainless Steel Stopper | |||||||
CAD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Days to Ship |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products | 8 Days or more |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products | 5 Days or more |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day
Show Stock Products | 8 Days or more | 8 Days or more |
Same day
Show Stock Products | 8 Days or more |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products | 8 Days or more | 8 Days or more | 8 Days or more |
Same day or more
Show Stock Products | 8 Days or more |
Same day
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products | 8 Days or more |
Same day or more
Show Stock Products |
Same day
Show Stock Products | 8 Days or more |
Same day or more
Show Stock Products | 8 Days or more |
Same day or more
Show Stock Products | 8 Days or more | 8 Days or more |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products | 5 Days or more |
Specifications |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
Nut Type | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Pre-Assembly Insertion Nuts | Pre-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Pre-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | - | Pre-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Long Nuts | Pre-Assembly Insertion Nuts | - | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Pre-Assembly Insertion Screws | - | Pre-Assembly Insertion Stoppers | Pre-Assembly Insertion Stoppers | Pre-Assembly Insertion Nuts | Pre-Assembly Insertion Nuts | Pre-Assembly Insertion Nuts | Pre-Assembly Insertion Nuts | Pre-Assembly Insertion Stoppers | Post-Assembly Insertion Nuts | Post-Assembly Insertion Stoppers | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Flanged Nuts | Long Nuts | Pre-Assembly Insertion Nuts | Pre-Assembly Insertion Stoppers | Pre-Assembly Insertion Stoppers | Pre-Assembly Insertion Nuts | Pre-Assembly Insertion Nuts | Pre-Assembly Insertion Nuts | Pre-Assembly Insertion Nuts | Pre-Assembly Insertion Nuts | Post-Assembly Insertion Stoppers | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts |
Series Name | 5 Series | 5 Series | 5 Series | 8 Series / 8-45 Series | 8 Series / 8-45 Series | 8 Series / 8-45 Series | 5 Series | 6 Series | 6 Series | 5 Series | 5 Series | 5 Series | 5 Series | 6 Series | 6 Series | 6 Series | 6 Series | 8 Series / 8-45 Series | 8 Series / 8-45 Series | 5 Series | 3 Series | 5 Series | 5 Series | 5 Series | 5 Series | 5 Series | 5 Series | 5 Series | 5 Series | 5 Series | 5 Series | 5 Series | - | 5 Series | 6 Series | 6 Series | 6 Series | 6 Series | 6 Series | 6 Series | 6 Series | 6 Series | 6 Series | 6 Series | 6 Series |
Thread Nominal M(mm) | M3 / M4 / M5 | M3 / M4 / M5 | M3 / M4 / M5 | M4 / M5 / M6 / M8 | M4 / M5 / M6 / M8 | M4 / M5 / M6 / M8 | M3 / M4 / M5 | M3 / M4 / M5 / M6 | M3 / M4 / M5 / M6 | M3 / M4 | M3 / M4 / M5 | M3 / M4 / M5 | - | M3 / M4 / M5 / M6 | M3 / M4 / M5 / M6 | M3 / M4 / M5 / M6 | M3 / M4 / M5 / M6 | M4 / M5 / M6 / M8 | M8 | M5 | M3 | - | - | M3 / M4 / M5 | M3 / M4 / M5 | M5 | M3 / M4 / M5 | - | M3 / M4 / M5 | - | M5 | M3 / M4 / M5 | M4 / M5 / M6 / M8 | - | M3 / M4 / M5 / M6 | - | - | M3 / M4 / M5 / M6 | M6 | M4 / M5 / M6 | - | M4 / M5 / M6 | - | M3 / M4 / M5 / M6 | M3 / M4 / M5 / M6 |
Function | with Insertion Spring Nuts | Nut and Stopper Set | with Leaf Spring | Standard | with Insertion Spring Nuts | with Leaf Spring | Short Nuts | Standard | Short Nuts | - | Standard | Short Nuts | - | with Nonskid | - | with Leaf Spring | with Insertion Spring Nuts | with Insertion Spring Nuts | Lock Nuts | Conductive | Economy | - | - | with Nonskid | with Insertion Spring Nuts | Lock Nuts | Economy | - | Standard | - | Lock Nuts | Lock Nuts | - | - | Standard | - | - | with Insertion Spring Nuts | Lock Nuts | Short Nuts | Eccentricity | Economy | - | Nut and Stopper Set | Nut and Stopper Set |
Material | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Steel | Stainless Steel ~ Steel | Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Steel | Stainless Steel | Steel | Resin | Stainless Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Steel | Steel | Stainless Steel | Stainless Steel ~ Steel | Resin ~ Stainless Steel | Steel | Stainless Steel ~ Steel | Stainless Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Resin | Stainless Steel | Stainless Steel ~ Steel | Steel | Steel | Stainless Steel | Steel | Resin ~ Stainless Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel |
Loosening Prevention | Provided / None | None | None | Provided / None | Provided / None | None | None | Provided / None | None | Provided / None | Provided / None | None | None | None | Provided / None | None | Provided / None | Provided / None | None | None | None | None | None | None | Provided / None | None | None | None | Provided / None | None | None | None | None | None | Provided / None | None | None | Provided / None | None | None | None | None | None | None | None |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy