(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 7:00 p.m. 11/23/2024 to 5:00 p.m. (CST) 11/24/2024. We apologize for the inconvenience.

Pipe Nipples - Schedule 40 Pipe Nipples (Both Ends Threaded), Male NPT, Aluminum

Pipe Nipples - Schedule 40 Pipe Nipples (Both Ends Threaded), Male NPT, Aluminum

Pipe Nipples that are Schedule 40 are well suited for low-to-medium pressure applications. Aluminum has good corrosion resistance and is lightweight.

part numbermaterialschedulestylethreadpipe sizelengthconstructionconnection (a)connection (b)working pressurespecs met
zusa-pf-5652aluminumschedule 40pipe nipplethreaded on both ends1/2"1-1/2"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5653aluminumschedule 40pipe nipplethreaded on both ends3/4"1-1/2"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5666aluminumschedule 40pipe nipplethreaded on both ends1/2"2"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5667aluminumschedule 40pipe nipplethreaded on both ends3/4"2"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5668aluminumschedule 40pipe nipplethreaded on both ends1"2"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5669aluminumschedule 40pipe nipplethreaded on both ends1-1/4"2"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5670aluminumschedule 40pipe nipplethreaded on both ends1-1/2"2"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5680aluminumschedule 40pipe nipplethreaded on both ends1/2"2-1/2"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5681aluminumschedule 40pipe nipplethreaded on both ends3/4"2-1/2"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5682aluminumschedule 40pipe nipplethreaded on both ends1"2-1/2"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5683aluminumschedule 40pipe nipplethreaded on both ends1-1/4"2-1/2"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5684aluminumschedule 40pipe nipplethreaded on both ends1-1/2"2-1/2"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5685aluminumschedule 40pipe nipplethreaded on both ends2"2-1/2"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5694aluminumschedule 40pipe nipplethreaded on both ends1/2"3"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5695aluminumschedule 40pipe nipplethreaded on both ends3/4"3"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5696aluminumschedule 40pipe nipplethreaded on both ends1"3"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5697aluminumschedule 40pipe nipplethreaded on both ends1-1/4"3"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5698aluminumschedule 40pipe nipplethreaded on both ends1-1/2"3"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5699aluminumschedule 40pipe nipplethreaded on both ends2"3"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5700aluminumschedule 40pipe nipplethreaded on both ends2-1/2"3"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5701aluminumschedule 40pipe nipplethreaded on both ends3"3"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5722aluminumschedule 40pipe nipplethreaded on both ends1/2"4"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5723aluminumschedule 40pipe nipplethreaded on both ends3/4"4"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5724aluminumschedule 40pipe nipplethreaded on both ends1"4"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5725aluminumschedule 40pipe nipplethreaded on both ends1-1/4"4"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5726aluminumschedule 40pipe nipplethreaded on both ends1-1/2"4"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5727aluminumschedule 40pipe nipplethreaded on both ends2"4"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5728aluminumschedule 40pipe nipplethreaded on both ends2-1/2"4"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5729aluminumschedule 40pipe nipplethreaded on both ends3"4"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5730aluminumschedule 40pipe nipplethreaded on both ends4"4"seamless4" npt male4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5778aluminumschedule 40pipe nipplethreaded on both ends1/2"6"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5779aluminumschedule 40pipe nipplethreaded on both ends3/4"6"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5780aluminumschedule 40pipe nipplethreaded on both ends1"6"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5781aluminumschedule 40pipe nipplethreaded on both ends1-1/4"6"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5782aluminumschedule 40pipe nipplethreaded on both ends1-1/2"6"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5783aluminumschedule 40pipe nipplethreaded on both ends2"6"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5784aluminumschedule 40pipe nipplethreaded on both ends2-1/2"6"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5785aluminumschedule 40pipe nipplethreaded on both ends3"6"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5786aluminumschedule 40pipe nipplethreaded on both ends4"6"seamless4" npt male4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5787aluminumschedule 40pipe nipplethreaded on both ends5"6"seamless5" npt male5" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5788aluminumschedule 40pipe nipplethreaded on both ends6"6"seamless6" npt male6" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5862aluminumschedule 40pipe nipplethreaded on both ends1/2"12"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5863aluminumschedule 40pipe nipplethreaded on both ends3/4"12"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5864aluminumschedule 40pipe nipplethreaded on both ends1"12"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5865aluminumschedule 40pipe nipplethreaded on both ends1-1/4"12"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5866aluminumschedule 40pipe nipplethreaded on both ends1-1/2"12"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5867aluminumschedule 40pipe nipplethreaded on both ends2"12"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5868aluminumschedule 40pipe nipplethreaded on both ends2-1/2"12"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5869aluminumschedule 40pipe nipplethreaded on both ends3"12"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5870aluminumschedule 40pipe nipplethreaded on both ends4"12"seamless4" npt male4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5871aluminumschedule 40pipe nipplethreaded on both ends5"12"seamless5" npt male5" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5872aluminumschedule 40pipe nipplethreaded on both ends6"12"seamless6" npt male6" npt male150 psiastm b241, ansi/asme b1.20.1
            
Part Number
ZUSA-PF-5788
ZUSA-PF-5872
Part NumberMinimum order quantityVolume DiscountDays to Ship Connection Type Thread Nominal M1 Thread Nominal M2 Connection A Connection B Length
1 Piece(s)

13 Days

Thread <-> Thread, Equal Dia.6B(150A)6B(150A)6" NPT Male6" NPT Male6"
1 Piece(s)

13 Days

Thread <-> Thread, Unequal Dia.6B(150A)6B(150A)6" NPT Male6" NPT Male12"

Loading...

  1. 1

Basic Information

Material Aluminum Max. Operating Pressure(MPa) 1.034 Connecting Shape Close Pipe Nipples
Connection Thread Type M1 NPT Connection Thread Type M2 NPT Type Fitting

Additional Products in this Category

Tech Support