(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Post-Assembly Insertion Spring Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Buit-in Springs prevent the nuts from slipping off even inserted into the vertically-placed extrusions.
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Nut, Stopper Set for 5 Series Aluminum Extrusions
MISUMI
More inexpensive than when nuts and stoppers are purchased separately
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Insertion Nuts with Leaf Spring for 5 Series Aluminum Extrusions
MISUMI
Leaf spring is welded to the stopper nut. The nut will not fall if the extrusion is held vertically.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Insertion Short Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Please use this in combination with the Post-Assembly Insertion Stopper HNAST or HNBST.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Insertion Nuts with Leaf Spring for 8 Series Aluminum Extrusions
MISUMI
Leaf spring is welded to the stopper nut. The nut will not fall if the extrusion is held vertically.
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Short Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Can be mounted on a limited space.
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Nuts with Leaf Spring for 6 Series Aluminum Extrusions
MISUMI
Leaf spring is welded to the stopper nut. The nut will not fall if the extrusion is held vertically.
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Spring Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Buit-in Springs prevent the nuts from slipping off even inserted into the vertically-placed extrusions.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
MISUMI
Can be mounted on a limited space.
Days to Ship: | 8 Days or more |
---|
Post-Assembly Fitting Spring Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Buit-in Springs prevent the nuts from slipping off even inserted into the vertically-placed extrusions.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Fitting Lock Nuts with Leaf Spring for8 Series Aluminum Extrusions
MISUMI
Leaf Spring-welded Lock Nuts allowing for easy positioning.
Special Price | |
Days to Ship: | Same day |
Show Stock Products
Post-Assembly Stopper Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Can be used in combination with the Post-Assembly Insertion Stopper HNAST or HNBST.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Insertion Lock Nuts with Leaf Spring for 5 Series Aluminum Extrusions
MISUMI
Leaf Spring-welded Lock Nuts allowing for easy positioning.
Special Price | |
Days to Ship: | Same day |
Show Stock Products
Post-Assembly Insertion Lock Nuts for 5 Series Aluminum Extrusions
MISUMI
Included set screws make it possible to fix the position of nut
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Insertion Nut, Stopper Set for 6 Series Aluminum Extrusions, Polypropylene Stopper
MISUMI
Set product more inexpensive than when nuts and stoppers are purchased separately
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Insertion Nut, Stopper Set for 6 Series Aluminum Extrusions, Stainless Steel Stopper
MISUMI
Set product more inexpensive than when nuts and stoppers are purchased separately
Days to Ship: | 5 Days or more |
---|
Post-Assembly Insertion Lock Nuts with Leaf Spring for 6 Series Aluminum Extrusions
MISUMI
Has the Leaf Spring welded to the Post-Assembly Insertion Nut to facilitate positioning.
Days to Ship: | Same day |
---|
Show Stock Products
Post-Assembly Insertion Lock Nuts for 6 Series Aluminum Extrusions
MISUMI
Included set screws make it possible to fix the position of nut
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Stopper Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Please use this in combination with the Post-Assembly Insertion Stopper HNAST or HNBST.
Special Price | |
Days to Ship: | Same day or more |
Show Stock Products
Post-Assembly Fitting Stoppers for 8 Series Aluminum Extrusions
MISUMI
This is Post-Assembly Insertion Stopper Nut.
Days to Ship: | 8 Days or more |
---|
Post-Assembly Fitting Nut and Stopper Sets for 8 Series Aluminum Extrusions
MISUMI
Set product more inexpensive than when nuts and stoppers are purchased separately
Days to Ship: | Same day or more |
---|
Show Stock Products
Post-Assembly Fitting Nut and Metal Stopper Sets for 8 Series Aluminum Extrusions
MISUMI
Set product more inexpensive than when nuts and stoppers are purchased separately
Days to Ship: | 5 Days or more |
---|
Post-Assembly Short Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】
MISUMI
Enables post-assembly in limited spaces.
Days to Ship: | 8 Days or more |
---|
Post-Assembly Insertion Nuts/Metal Stopper Set for 20mm Square 5 Series Aluminum Extrusion
MISUMI
More inexpensive than when nuts and stoppers are purchased separately
Days to Ship: | 8 Days or more |
---|
Post-Assembly Fitting Lock Nuts for 8 Series Aluminum Extrusions
MISUMI
•Nut Type: Post-Assembly Insertion Nuts
•Function: Lock Nuts
•Surface Treatment: Trivalent Chromate
•Extrusion Series: HFS
•Extrusion No.: 8,8-45
Days to Ship: | 8 Days or more |
---|
Post-Assembly Insertion Nut Set (Steel)
NIC Autotec
Nut compatible to various types of frames.
[Features]
· The nut material is steel (trivalent chromate) and the nut holder is polyacetal.
· When an assembled frame is to be expanded, etc., the nut can be inserted without dismantling the frame.
· Screw holes can also be chosen.
· Comes with a nut holder.
· Structural element for factory automation equipment.
[Applications]
· Cover material for factory automation equipment.
· Component members for display stand covers, work benches or frames.
Days to Ship: | 8 Days or more |
---|
Brand |
---|
Product Series |
CAD |
Days to Ship |
Specifications |
Nut Type |
Series Name |
Thread Nominal M(mm) |
Function |
Material |
Loosening Prevention |
|
|
|
|
|
|
|
|
|
|
| ||||||||||||||||
Brand | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | NIC Autotec |
Product Series | Post-Assembly Insertion Spring Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Insertion Nut, Stopper Set for 5 Series Aluminum Extrusions | Post-Assembly Insertion Nuts with Leaf Spring for 5 Series Aluminum Extrusions | Post-Assembly Insertion Short Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Insertion Nuts with Leaf Spring for 8 Series Aluminum Extrusions | Post-Assembly Insertion Short Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Insertion Nuts with Leaf Spring for 6 Series Aluminum Extrusions | Post-Assembly Insertion Spring Nuts for 6 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Fitting Spring Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Fitting Lock Nuts with Leaf Spring for8 Series Aluminum Extrusions | Post-Assembly Stopper Nuts for 5 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Insertion Lock Nuts with Leaf Spring for 5 Series Aluminum Extrusions | Post-Assembly Insertion Lock Nuts for 5 Series Aluminum Extrusions | Post-Assembly Insertion Nut, Stopper Set for 6 Series Aluminum Extrusions, Polypropylene Stopper | Post-Assembly Insertion Nut, Stopper Set for 6 Series Aluminum Extrusions, Stainless Steel Stopper | Post-Assembly Insertion Lock Nuts with Leaf Spring for 6 Series Aluminum Extrusions | Post-Assembly Insertion Lock Nuts for 6 Series Aluminum Extrusions | Post-Assembly Stopper Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Fitting Stoppers for 8 Series Aluminum Extrusions | Post-Assembly Fitting Nut and Stopper Sets for 8 Series Aluminum Extrusions | Post-Assembly Fitting Nut and Metal Stopper Sets for 8 Series Aluminum Extrusions | Post-Assembly Short Nuts for 8 Series Aluminum Extrusions【1-100 Pieces Per Package】 | Post-Assembly Insertion Nuts/Metal Stopper Set for 20mm Square 5 Series Aluminum Extrusion | Post-Assembly Fitting Lock Nuts for 8 Series Aluminum Extrusions | ||
CAD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Days to Ship |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products | 8 Days or more |
Same day or more
Show Stock Products |
Same day
Show Stock Products |
Same day or more
Show Stock Products |
Same day
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products | 5 Days or more |
Same day
Show Stock Products |
Same day or more
Show Stock Products |
Same day or more
Show Stock Products | 8 Days or more |
Same day or more
Show Stock Products | 5 Days or more | 8 Days or more | 8 Days or more | 8 Days or more | 8 Days or more |
Specifications |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Nut Type | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts | Post-Assembly Insertion Nuts |
Series Name | 5 Series | 5 Series | 5 Series | 6 Series | 8 Series / 8-45 Series | 5 Series | 6 Series | 6 Series | 6 Series | 8 Series / 8-45 Series | 8 Series / 8-45 Series | 5 Series | 5 Series | 5 Series | 6 Series | 6 Series | 6 Series | 6 Series | 8 Series / 8-45 Series | 8 Series / 8-45 Series | 8 Series / 8-45 Series | 8 Series / 8-45 Series | 8 Series / 8-45 Series | 5 Series | - | - |
Thread Nominal M(mm) | M3 / M4 / M5 | M3 / M4 / M5 | M3 / M4 / M5 | M3 / M4 / M5 / M6 | M4 / M5 / M6 / M8 | M3 / M4 / M5 | M3 / M4 / M5 / M6 | M3 / M4 / M5 / M6 | M3 / M4 / M5 / M6 | M4 / M5 / M6 / M8 | M8 | M3 / M4 / M5 | M5 | M3 / M4 / M5 | M3 / M4 / M5 / M6 | M3 / M4 / M5 / M6 | M6 | M3 / M4 / M5 / M6 | M4 / M5 / M6 / M8 | - | M4 / M5 / M6 / M8 | M4 / M5 / M6 / M8 | M3 / M4 / M8 | M3 / M4 / M5 | M4 / M5 / M6 / M8 | M3 / M4 / M5 / M6 / M8 |
Function | with Insertion Spring Nuts | Nut and Stopper Set | with Leaf Spring | Standard | with Leaf Spring | Short Nuts | with Leaf Spring | with Insertion Spring Nuts | Short Nuts | with Insertion Spring Nuts | Lock Nuts | Standard | Lock Nuts | Lock Nuts | Nut and Stopper Set | Nut and Stopper Set | Lock Nuts | Lock Nuts | Standard | - | Nut and Stopper Set | Nut and Stopper Set | Short Nuts | Nut and Stopper Set | Lock Nuts | Nut and Stopper Set |
Material | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Steel | Stainless Steel ~ Steel | Steel | Stainless Steel ~ Steel | Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Stainless Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Steel | Stainless Steel ~ Steel | Stainless Steel ~ Steel | Steel |
Loosening Prevention | Provided / None | None | None | Provided / None | None | None | None | Provided / None | None | Provided / None | None | Provided / None | None | None | None | None | None | Provided / None | Provided / None | None | None | None | None | None | None | None |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy