(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
You can do the maintenance and adjustment of the sequencer without opening the door of the control panel.
[Features]
•AC 100 V outlet in the PC connector BOX (PCB type: 2P E with 2 outlets, PCBK type: 1P with ground) and (standard equipment), data communication connector can be set.
You can carry out trial operation adjustments in dusty places without having to open the control panel door (to prevent the intrusion of dust and the like while carrying out the adjustment by test operation).
•By attaching the PC connector BOX to the door surface of a sequencer panel or the like that is housed in a find location, adjustment by test operation and maintenance work can be easily carried out.
Besides the standard connector for data communication, there are products compatible with the PLCs made by all companies, so please specify the connector and communication cable models.
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy