(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Pipe Nipples w/ Thread Sealant - Schedule 40 Pipe Nipples (Both Ends Threaded), Male NPT, Aluminum (ZUSA-PF-6299)

Pipe Nipples w/ Thread Sealant - Schedule 40 Pipe Nipples (Both Ends Threaded), Male NPT, Aluminum ZUSA-PF-6299

Pipe Nipples have male threads on these fittings and have a pre-applied PTFE thread sealant for extra leak protection. Schedule 40 nipples are well suited for low-to-medium pressure applications. Aluminum has good corrosion resistance and is lightweight.

Part Number

Configured Part Number is shown.

ZUSA-PF-6299

part numbermaterialschedulestylethreadpre-applied thread sealantpipe sizelengthconstructionconnection (a)connection (b)working pressurespecs met
zusa-pf-6088aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1/2"1-1/2"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6089aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3/4"1-1/2"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6102aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1/2"2"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6103aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3/4"2"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6104aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1"2"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6105aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/4"2"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6106aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/2"2"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6116aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1/2"2-1/2"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6117aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3/4"2-1/2"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6118aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1"2-1/2"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6119aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/4"2-1/2"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6120aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/2"2-1/2"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6121aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant2"2-1/2"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6130aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1/2"3"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6131aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3/4"3"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6132aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1"3"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6133aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/4"3"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6134aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/2"3"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6135aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant2"3"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6136aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant2-1/2"3"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6137aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3"3"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6158aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1/2"4"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6159aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3/4"4"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6160aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1"4"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6161aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/4"4"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6162aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/2"4"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6163aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant2"4"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6164aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant2-1/2"4"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6165aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3"4"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6166aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant4"4"seamless4" npt male4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6214aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1/2"6"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6215aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3/4"6"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6216aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1"6"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6217aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/4"6"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6218aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/2"6"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6219aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant2"6"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6220aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant2-1/2"6"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6221aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3"6"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6222aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant4"6"seamless4" npt male4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6223aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant5"6"seamless5" npt male5" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6224aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant6"6"seamless6" npt male6" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6298aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1/2"12"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6299aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3/4"12"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6300aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1"12"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6301aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/4"12"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6302aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant1-1/2"12"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6303aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant2"12"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6304aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant2-1/2"12"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6305aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant3"12"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6306aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant4"12"seamless4" npt male4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6307aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant5"12"seamless5" npt male5" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-6308aluminumschedule 40pipe nipplethreaded on both endsptfe thread sealant6"12"seamless6" npt male6" npt male150 psiastm b241, ansi/asme b1.20.1
             
Part Number
ZUSA-PF-6299
Part NumberMinimum order quantityVolume DiscountDays to Ship Connection Type Thread Nominal M1 Thread Nominal M2 Connection A Connection B Length
1 Piece(s)

81 Days

Thread <-> Thread, Unequal Dia.3/4B(20A)3/4B(20A)3/4" NPT Male3/4" NPT Male12"

Loading...

  1. 1

Basic Information

Material Aluminum Max. Operating Pressure(MPa) 1.034 Connecting Shape Close Pipe Nipples
Connection Thread Type M1 NPT Connection Thread Type M2 NPT Type Fitting

Please check the type/dimensions/specifications of the part ZUSA-PF-6299 in the Pipe Nipples w/ Thread Sealant - Schedule 40 Pipe Nipples (Both Ends Threaded), Male NPT, Aluminum series.

Products like this...

Part Number
ZUSA-PF-6103
ZUSA-PF-6104
ZUSA-PF-6105
ZUSA-PF-6300
ZUSA-PF-6301
ZUSA-PF-6302
Part NumberMinimum order quantityVolume DiscountDays to Ship Connection Type Thread Nominal M1 Thread Nominal M2 Connection A Connection B Length
1 Piece(s)

Quote

Thread <-> Thread, Unequal Dia.3/4B(20A)3/4B(20A)3/4" NPT Male3/4" NPT Male2"
1 Piece(s)

Quote

Thread <-> Thread, Unequal Dia.1B(25A)1B(25A)1" NPT Male1" NPT Male2"
1 Piece(s)

81 Days

Thread <-> Thread, Unequal Dia.1 1/4B(32A)1 1/4B(32A)1-1/4" NPT Male1-1/4" NPT Male2"
1 Piece(s)

Quote

Thread <-> Thread, Unequal Dia.1B(25A)1B(25A)1" NPT Male1" NPT Male12"
1 Piece(s)

81 Days

Thread <-> Thread, Unequal Dia.1 1/4B(32A)1 1/4B(32A)1-1/4" NPT Male1-1/4" NPT Male12"
1 Piece(s)

81 Days

Thread <-> Thread, Unequal Dia.1 1/2B(40A)1 1/2B(40A)1-1/2" NPT Male1-1/2" NPT Male12"

Additional Products in this Category

Tech Support