(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

NBK Manual Goniometer Stages

Days to Ship
  • All
  • 8 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 30 Days or Less
  • 48 Days or Less
  • 78 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Goniometer Axis
Travel (Range)(mm)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Overall Height H (Range)(mm)
Feeding Method
Center of Rotation Height (Range)(mm)
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual Goniometer Stages - Dovetail, High Precision, TGOH

    Brand

    NBK

    Product Series

    Manual Goniometer Stages - Dovetail, High Precision, TGOH

    CAD
    • 2D / 3D
    Days to Ship 11 Days or more
    Goniometer AxisX Axis
    Travel (Range)(mm)Up to ±10
    Load Capacity (Range)(N)5 to 30 / 30.1 to 50
    Table Size (Length) L (Range)(mm)Up to 25 / 26 to 40 / 41 to 60
    Table Size (Width) W (Range)(mm)Up to 25 / 26 to 40 / 41 to 60
    Overall Height H (Range)(mm)1 to 15 ~ 30.1 to 35
    Feeding Method-
    Center of Rotation Height (Range)(mm)1 to 15 ~ 40.1 to 50
    Guiding MechanismDovetail Slide
    Table MaterialBrass
    Table Surface TreatmentLow Temperature Black Chrome

    Loading...

    1. 1

    Related Categories to Manual Goniometer Stages