(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

NBK Manual X-Axis Stages(Load Capacity (Range):30.1 to 50)

Days to Ship
  • All
  • Same day
  • 8 Days or Less
  • 9 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 15 Days or Less
  • 18 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Travel (Range)
Load Capacity (Range)(N)
Table Length L (Range)(mm)
Table Width W (Range)(mm)
Overall Height (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual X-Axis Stages - Dovetail, Rack and Pinion, Small, TAR-X

    Brand

    NBK

    Product Series

    Manual X-Axis Stages - Dovetail, Rack and Pinion, Small, TAR-X

    CAD
    • 2D / 3D
    Days to Ship 11 Days or more
    Travel (Range)Up to ±10mm
    Load Capacity (Range)(N)30.1 to 50
    Table Length L (Range)(mm)41 to 60
    Table Width W (Range)(mm)Up to 25
    Overall Height (Range)(mm)20.1 to 25
    Feeding MethodRack & Pinion
    Guiding MechanismDovetail Slide
    Table MaterialBrass
    Table Surface TreatmentLow Temperature Black Chrome

    Loading...

    1. 1

    Related Categories to Manual X-Axis Stages