(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Hitachi Cable Control & Instrumentation Cables

Days to Ship
  • All
  • Same day
  • 5 Days or Less
  • 6 Days or Less
  • 7 Days or Less
  • 8 Days or Less
  • 9 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 36 Days or Less
  1. 1
Brand
Product Series
Days to Ship
Total length(m)
Specified length(m)
Conductor cross section(mm2)
AWG size(AWG)
Number of cores(Core)
Logarithm
Finished outer diameter(mm)
Rated voltage
Shield
Sheath Characteristic
Representative standards
Sheath Color
Ground wire
Sheath Material
Insulation body materials

    MA Cable (Interface Cable) 2464-SB (MA) LF

    Brand

    Hitachi Cable

    Product Series

    MA Cable (Interface Cable) 2464-SB (MA) LF

    Days to Ship 36 Days or more
    Total length(m)100 ~ 200
    Specified length(m)-
    Conductor cross section(mm2)0.08
    AWG size(AWG)28
    Number of cores(Core)-
    Logarithm5P ~ 25P
    Finished outer diameter(mm)-
    Rated voltage300V
    ShieldPresent
    Sheath CharacteristicHeat resistance
    Representative standardsUL
    Sheath ColorGray
    Ground wire-
    Sheath MaterialPVC
    Insulation body materialsPVC

    Loading...

    1. 1

    Related Categories to Control & Instrumentation Cables