(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

7 LEADERS Ball End Mills (Carbide)(Work Material:Stainless Steel)

Days to Ship
  • All
  • Same day
  • 8 Days or Less
  • 9 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 17 Days or Less
  • 26 Days or Less
  1. 1
Brand
Product Series
Days to Ship
R Size(mm)
Model
Work Material
Flute Length (ℓ)(mm)
Number of Flutes(sheet)
Coating
Overall Length (L)(mm)
Length Under Neck (ℓ1)(mm)
Link Diameter (d)(mm)
R Precision(µm)
Processing Applications

    Carbide 2-Flute Short Ball End Mill 30° B222X

      Carbide 2-Flute Medium Ball End Mill 30° B232X

      Brand

      7 LEADERS

      7 LEADERS

      Product Series

      Carbide 2-Flute Short Ball End Mill 30° B222X

      Carbide 2-Flute Medium Ball End Mill 30° B232X

      Days to Ship 10 Days or more 10 Days or more
      R Size(mm)0.15 ~ 100.5 ~ 10
      ModelBoreBore
      Work MaterialStainless Steel[○]Stainless Steel[○]
      Flute Length (ℓ)(mm)0.6 ~ 382 ~ 38
      Number of Flutes(sheet)22
      Coating--
      Overall Length (L)(mm)50 ~ 10050 ~ 160
      Length Under Neck (ℓ1)(mm)--
      Link Diameter (d)(mm)4 ~ 206 ~ 20
      R Precision(µm)±10±10
      Processing ApplicationsCurved Surface / Carving / R-GrooveCurved Surface / Carving / R-Groove

      Loading...

      1. 1

      Related Categories to Ball End Mills (Carbide)