(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Pipe Nipples - Schedule 40 Pipe Nipples (Both Ends Threaded), Male NPT, Aluminum (ZUSA-PF-5653)

Pipe Nipples - Schedule 40 Pipe Nipples (Both Ends Threaded), Male NPT, Aluminum ZUSA-PF-5653

Pipe Nipples that are Schedule 40 are well suited for low-to-medium pressure applications. Aluminum has good corrosion resistance and is lightweight.

Part Number

Configured Part Number is shown.

ZUSA-PF-5653

part numbermaterialschedulestylethreadpipe sizelengthconstructionconnection (a)connection (b)working pressurespecs met
zusa-pf-5652aluminumschedule 40pipe nipplethreaded on both ends1/2"1-1/2"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5653aluminumschedule 40pipe nipplethreaded on both ends3/4"1-1/2"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5666aluminumschedule 40pipe nipplethreaded on both ends1/2"2"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5667aluminumschedule 40pipe nipplethreaded on both ends3/4"2"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5668aluminumschedule 40pipe nipplethreaded on both ends1"2"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5669aluminumschedule 40pipe nipplethreaded on both ends1-1/4"2"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5670aluminumschedule 40pipe nipplethreaded on both ends1-1/2"2"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5680aluminumschedule 40pipe nipplethreaded on both ends1/2"2-1/2"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5681aluminumschedule 40pipe nipplethreaded on both ends3/4"2-1/2"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5682aluminumschedule 40pipe nipplethreaded on both ends1"2-1/2"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5683aluminumschedule 40pipe nipplethreaded on both ends1-1/4"2-1/2"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5684aluminumschedule 40pipe nipplethreaded on both ends1-1/2"2-1/2"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5685aluminumschedule 40pipe nipplethreaded on both ends2"2-1/2"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5694aluminumschedule 40pipe nipplethreaded on both ends1/2"3"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5695aluminumschedule 40pipe nipplethreaded on both ends3/4"3"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5696aluminumschedule 40pipe nipplethreaded on both ends1"3"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5697aluminumschedule 40pipe nipplethreaded on both ends1-1/4"3"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5698aluminumschedule 40pipe nipplethreaded on both ends1-1/2"3"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5699aluminumschedule 40pipe nipplethreaded on both ends2"3"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5700aluminumschedule 40pipe nipplethreaded on both ends2-1/2"3"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5701aluminumschedule 40pipe nipplethreaded on both ends3"3"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5722aluminumschedule 40pipe nipplethreaded on both ends1/2"4"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5723aluminumschedule 40pipe nipplethreaded on both ends3/4"4"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5724aluminumschedule 40pipe nipplethreaded on both ends1"4"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5725aluminumschedule 40pipe nipplethreaded on both ends1-1/4"4"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5726aluminumschedule 40pipe nipplethreaded on both ends1-1/2"4"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5727aluminumschedule 40pipe nipplethreaded on both ends2"4"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5728aluminumschedule 40pipe nipplethreaded on both ends2-1/2"4"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5729aluminumschedule 40pipe nipplethreaded on both ends3"4"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5730aluminumschedule 40pipe nipplethreaded on both ends4"4"seamless4" npt male4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5778aluminumschedule 40pipe nipplethreaded on both ends1/2"6"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5779aluminumschedule 40pipe nipplethreaded on both ends3/4"6"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5780aluminumschedule 40pipe nipplethreaded on both ends1"6"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5781aluminumschedule 40pipe nipplethreaded on both ends1-1/4"6"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5782aluminumschedule 40pipe nipplethreaded on both ends1-1/2"6"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5783aluminumschedule 40pipe nipplethreaded on both ends2"6"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5784aluminumschedule 40pipe nipplethreaded on both ends2-1/2"6"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5785aluminumschedule 40pipe nipplethreaded on both ends3"6"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5786aluminumschedule 40pipe nipplethreaded on both ends4"6"seamless4" npt male4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5787aluminumschedule 40pipe nipplethreaded on both ends5"6"seamless5" npt male5" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5788aluminumschedule 40pipe nipplethreaded on both ends6"6"seamless6" npt male6" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5862aluminumschedule 40pipe nipplethreaded on both ends1/2"12"seamless1/2" npt male1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5863aluminumschedule 40pipe nipplethreaded on both ends3/4"12"seamless3/4" npt male3/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5864aluminumschedule 40pipe nipplethreaded on both ends1"12"seamless1" npt male1" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5865aluminumschedule 40pipe nipplethreaded on both ends1-1/4"12"seamless1-1/4" npt male1-1/4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5866aluminumschedule 40pipe nipplethreaded on both ends1-1/2"12"seamless1-1/2" npt male1-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5867aluminumschedule 40pipe nipplethreaded on both ends2"12"seamless2" npt male2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5868aluminumschedule 40pipe nipplethreaded on both ends2-1/2"12"seamless2-1/2" npt male2-1/2" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5869aluminumschedule 40pipe nipplethreaded on both ends3"12"seamless3" npt male3" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5870aluminumschedule 40pipe nipplethreaded on both ends4"12"seamless4" npt male4" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5871aluminumschedule 40pipe nipplethreaded on both ends5"12"seamless5" npt male5" npt male150 psiastm b241, ansi/asme b1.20.1
zusa-pf-5872aluminumschedule 40pipe nipplethreaded on both ends6"12"seamless6" npt male6" npt male150 psiastm b241, ansi/asme b1.20.1
            
Part Number
ZUSA-PF-5653
Part NumberMinimum order quantityVolume DiscountDays to Ship Connection Type Thread Nominal M1 Thread Nominal M2 Connection A Connection B Length
1 Piece(s)

13 Days

Thread <-> Thread, Unequal Dia.3/4B(20A)3/4B(20A)3/4" NPT Male3/4" NPT Male1-1/2"

Loading...

  1. 1

Basic Information

Material Aluminum Max. Operating Pressure(MPa) 1.034 Connecting Shape Close Pipe Nipples
Connection Thread Type M1 NPT Connection Thread Type M2 NPT Type Fitting

Please check the type/dimensions/specifications of the part ZUSA-PF-5653 in the Pipe Nipples - Schedule 40 Pipe Nipples (Both Ends Threaded), Male NPT, Aluminum series.

Products like this...

Part Number
ZUSA-PF-5652
ZUSA-PF-5666
ZUSA-PF-5667
ZUSA-PF-5668
ZUSA-PF-5669
ZUSA-PF-5670
Part NumberMinimum order quantityVolume DiscountDays to Ship Connection Type Thread Nominal M1 Thread Nominal M2 Connection A Connection B Length
1 Piece(s)

81 Days

Thread <-> Thread, Unequal Dia.1/2B(15A)1/2B(15A)1/2" NPT Male1/2" NPT Male1-1/2"
1 Piece(s)

13 Days

Thread <-> Thread, Unequal Dia.1/2B(15A)1/2B(15A)1/2" NPT Male1/2" NPT Male2"
1 Piece(s)

13 Days

Thread <-> Thread, Unequal Dia.3/4B(20A)3/4B(20A)3/4" NPT Male3/4" NPT Male2"
1 Piece(s)

13 Days

Thread <-> Thread, Unequal Dia.1B(25A)1B(25A)1" NPT Male1" NPT Male2"
1 Piece(s)

13 Days

Thread <-> Thread, Unequal Dia.1 1/4B(32A)1 1/4B(32A)1-1/4" NPT Male1-1/4" NPT Male2"
1 Piece(s)

13 Days

Thread <-> Thread, Unequal Dia.1 1/2B(40A)1 1/2B(40A)1-1/2" NPT Male1-1/2" NPT Male2"

Additional Products in this Category

Tech Support