(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Hex Nut for Pipes - Carbon Steel, Surface Treatment Options, M8 - M16, 1 mm Pitch【250-1,000 Pieces Per Package】 (HNTPB-STN-M8-B12-H4)

Hex Nut for Pipes - Carbon Steel, Surface Treatment Options, M8 - M16, 1 mm Pitch HNTPB-STN-M8-B12-H4
  • Volume Discount

Compared with normal nuts, this nut is thinner with a narrower pitch (volume nut)

Part Number

Configured Part Number is shown.

HNTPB-STN-M8-B12-H4

Part Number
HNTPB-STN-M8-B12-H4
Part NumberNumber of pc(s). included in pkg.Minimum order quantityVolume DiscountDays to Ship RoHSNominal of Thread (M) Surface Treatment Surface Treatment (Details) B Dimension H Dimension

1,000 Pieces Per Package

1 Pack(s)Available

8 Days or more

108Nickel Plating[Nickel Plating] Nickel Plating124

Loading...

  1. 1

Basic Information

Material SWCH Equivalent Thread ridge type Nut for pipes Application / function For pipes
Sales Unit Box/package

Please check the type/dimensions/specifications of the part HNTPB-STN-M8-B12-H4 in the Hex Nut for Pipes - Carbon Steel, Surface Treatment Options, M8 - M16, 1 mm Pitch series.

Products like this...

Part Number
HNTPB-ST-M12-B14-H2
HNTPB-ST-M12-B17-H3
HNTPB-ST-M12-B17-H4
HNTPB-STU-M10-B14-H2
HNTPB-STU-M10-B14-H3
HNTPB-STU-M10-B14-H4
Part NumberNumber of pc(s). included in pkg.Minimum order quantityVolume DiscountDays to Ship RoHSNominal of Thread (M) Surface Treatment Surface Treatment (Details) B Dimension H Dimension

800 Pieces Per Package

1 Pack(s)Available

8 Days or more

1012[No] Fabric[No] Fabric142

400 Pieces Per Package

1 Pack(s)Available

8 Days or more

1012[No] Fabric[No] Fabric173

300 Pieces Per Package

1 Pack(s)Available

8 Days or more

1012[No] Fabric[No] Fabric174

800 Pieces Per Package

1 Pack(s)Available

8 Days or more

-10Bright Chromate PlatingBright Chromate Plating142

500 Pieces Per Package

1 Pack(s)Available

8 Days or more

-10Bright Chromate PlatingBright Chromate Plating143

400 Pieces Per Package

1 Pack(s)Available

8 Days or more

-10Bright Chromate PlatingBright Chromate Plating144

Additional Products in this Category

Tech Support