(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 7:00 p.m. 11/23/2024 to 5:00 p.m. (CST) 11/24/2024. We apologize for the inconvenience.

Straight Block Punches(With/without jector:With)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 15 Days or Less
  • 16 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Specifications
Shank type
With/without jector
Tip shape
Material
Surface treatment
Shank (mounting part) shape

    Jector Straight Punches

      Jector Straight Punches -TiCN Coating-

      Brand

      MISUMI

      MISUMI

      Product Series

      Jector Straight Punches

      Jector Straight Punches -TiCN Coating-

      CAD
      • 2D / 3D
      • 2D / 3D
      Days to Ship 8 Days or more 16 Days or more
      Specifications
      • SKH51
      • SKD11
      • POWDER HSS
      • SKH51
      • POWDER HSS
      • TiCN
      Shank typeStraightStraight
      With/without jectorWithWith
      Tip shapeD / R / E / GD / R / E / G
      MaterialSKD11 Equivalent / SKH51 Equivalent / Powdered high-speed steelSKH51 Equivalent / Powdered high-speed steel
      Surface treatmentNoneTiCN
      Shank (mounting part) shapeTapped / With key groove / Single-flanged / Double-flangedTapped / With key groove

      Loading...

      1. 1

      Related Categories to Straight Block Punches