(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Manual Goniometer Stages(Center of Rotation Height (Range):1 to 15)

Days to Ship
  • All
  • 8 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 30 Days or Less
  • 48 Days or Less
  • 78 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Specifications
Goniometer Axis
Travel (Range)(mm)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Overall Height H (Range)(mm)
Feeding Method
Center of Rotation Height (Range)(mm)
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual Goniometer Stages - 2-Axis, Cross Roller Guide, GPWG

      Manual Goniometer Stages - Dovetail, High Precision, TGOH

      Brand

      MISUMI

      NBK

      Product Series

      Manual Goniometer Stages - 2-Axis, Cross Roller Guide, GPWG

      Manual Goniometer Stages - Dovetail, High Precision, TGOH

      CAD
      • 2D / 3D
      • 2D / 3D
      Days to Ship 12 Days or more 11 Days or more
      Specifications
      • inCAD Components
        Goniometer AxisXY AxisX Axis
        Travel (Range)(mm)Up to ±10Up to ±10
        Load Capacity (Range)(N)30.1 to 5030.1 to 50
        Table Size (Length) L (Range)(mm)41 to 6026 to 40
        Table Size (Width) W (Range)(mm)41 to 6026 to 40
        Overall Height H (Range)(mm)40.1 to 5015.1 to 20
        Feeding MethodMicrometer Heads-
        Center of Rotation Height (Range)(mm)1 to 151 to 15
        Guiding MechanismCross RollerDovetail Slide
        Table MaterialAluminum AlloyBrass
        Table Surface TreatmentBlack AnodizeLow Temperature Black Chrome

        Loading...

        1. 1

        Related Categories to Manual Goniometer Stages