(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Manual XZ-Axis Stages(Travel (Z Distance) Range:10 to 20)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 67 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Stage (Z) Surface Orientation
Travel (X Distance) Range(mm)
Travel (Z Distance) Range(mm)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Table Size (Thickness) H (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual XZ-Axis Stages - Dovetail, Rack and Pinion, Lever Clamp

    Brand

    Chuo Precision Industrial

    Product Series

    Manual XZ-Axis Stages - Dovetail, Rack and Pinion, Lever Clamp

    CAD
    • 2D / 3D
    Days to Ship 11 Days or more
    Stage (Z) Surface OrientationVertical
    Travel (X Distance) Range(mm)±10 to 30mm
    Travel (Z Distance) Range(mm)10 to 20
    Load Capacity (Range)(N)5 to 30
    Table Size (Length) L (Range)(mm)26 to 40
    Table Size (Width) W (Range)(mm)41 to 60
    Table Size (Thickness) H (Range)(mm)-
    Feeding MethodRack & Pinion
    Guiding MechanismDovetail Slide
    Table MaterialAluminum Alloy
    Table Surface TreatmentBlack Anodize

    Loading...

    1. 1

    Related Categories to Manual XZ-Axis Stages