(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Manual Z-Axis Stages(Feeding Method:Handles)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 22 Days or Less
  • 23 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Stage Surface Orientation
Travel (Range)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Table Size (Thickness) H (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual Z-Axis Stages - Laboratory Jack (B35)

      Manual Z-Axis Stages - Precision Lab Jack TLJK

      Brand

      Suruga Seiki

      NBK

      Product Series

      Manual Z-Axis Stages - Laboratory Jack (B35)

      Manual Z-Axis Stages - Precision Lab Jack TLJK

      CAD
      • 2D / 3D
      • 2D / 3D
      Days to Ship 8 Days or more 11 Days or more
      Stage Surface OrientationHorizontalHorizontal
      Travel (Range)±10 to 30mm / ±30mm or More±10 to 30mm / ±30mm or More
      Load Capacity (Range)(N)50.1 to 100100.1 or More
      Table Size (Length) L (Range)(mm)91 to 120 ~ 121 or More121 or More
      Table Size (Width) W (Range)(mm)61 to 90 ~ 91 to 12061 to 90 ~ 121 or More
      Table Size (Thickness) H (Range)(mm)50.1 to 60 ~ 80.1 to 10080.1 to 100 ~ 100.1 or More
      Feeding MethodHandlesHandles
      Guiding MechanismLab JacksPantograph
      Table MaterialAluminumAluminum Alloy
      Table Surface TreatmentBlack AnodizeBlack Anodize

      Loading...

      1. 1

      Related Categories to Manual Z-Axis Stages