(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Manual Z-Axis Stages(Guiding Mechanism:Lab Jacks)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 22 Days or Less
  • 23 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Specifications
Stage Surface Orientation
Travel (Range)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Table Size (Thickness) H (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual Z-Axis Stages - Lab Jacks - ZLJG Series

      Manual Z-Axis Stages - Laboratory Jack (B35)

      Brand

      MISUMI

      Suruga Seiki

      Product Series

      Manual Z-Axis Stages - Lab Jacks - ZLJG Series

      Manual Z-Axis Stages - Laboratory Jack (B35)

      CAD
      • 2D / 3D
      • 2D / 3D
      Days to Ship 10 Days or more 8 Days or more
      Specifications
      • inCAD Components
        Stage Surface OrientationHorizontalHorizontal
        Travel (Range)±30mm or More±10 to 30mm / ±30mm or More
        Load Capacity (Range)(N)50.1 to 10050.1 to 100
        Table Size (Length) L (Range)(mm)91 to 120 ~ 121 or More91 to 120 ~ 121 or More
        Table Size (Width) W (Range)(mm)61 to 90 ~ 91 to 12061 to 90 ~ 91 to 120
        Table Size (Thickness) H (Range)(mm)50.1 to 60 ~ 80.1 to 10050.1 to 60 ~ 80.1 to 100
        Feeding MethodFeed KnobHandles
        Guiding MechanismLab JacksLab Jacks
        Table MaterialAluminum AlloyAluminum
        Table Surface TreatmentBlack AnodizeBlack Anodize

        Loading...

        1. 1

        Related Categories to Manual Z-Axis Stages