(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Manual Z-Axis Stages(Guiding Mechanism:Pantograph)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 22 Days or Less
  • 23 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Stage Surface Orientation
Travel (Range)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Table Size (Thickness) H (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual Z-Axis Stages - Precision Lab Jack TLJK

    Brand

    NBK

    Product Series

    Manual Z-Axis Stages - Precision Lab Jack TLJK

    CAD
    • 2D / 3D
    Days to Ship 11 Days or more
    Stage Surface OrientationHorizontal
    Travel (Range)±10 to 30mm / ±30mm or More
    Load Capacity (Range)(N)100.1 or More
    Table Size (Length) L (Range)(mm)121 or More
    Table Size (Width) W (Range)(mm)61 to 90 ~ 121 or More
    Table Size (Thickness) H (Range)(mm)80.1 to 100 ~ 100.1 or More
    Feeding MethodHandles
    Guiding MechanismPantograph
    Table MaterialAluminum Alloy
    Table Surface TreatmentBlack Anodize

    Loading...

    1. 1

    Related Categories to Manual Z-Axis Stages