(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Manual Z-Axis Stages(Load Capacity (Range):100.1 or More)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 22 Days or Less
  • 23 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Stage Surface Orientation
Travel (Range)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Table Size (Thickness) H (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual Z-Axis Stages - Precision Lab Jack TLJK

      Manual Z-Axis Stages - Lab Jacks (Manual Stage)

      Brand

      NBK

      Chuo Precision Industrial

      Product Series

      Manual Z-Axis Stages - Precision Lab Jack TLJK

      Manual Z-Axis Stages - Lab Jacks (Manual Stage)

      CAD
      • 2D / 3D
      • 2D / 3D
      Days to Ship 11 Days or more 8 Days or more
      Stage Surface OrientationHorizontalHorizontal
      Travel (Range)±10 to 30mm / ±30mm or More-
      Load Capacity (Range)(N)100.1 or More100.1 or More
      Table Size (Length) L (Range)(mm)121 or More121 or More
      Table Size (Width) W (Range)(mm)61 to 90 ~ 121 or More121 or More
      Table Size (Thickness) H (Range)(mm)80.1 to 100 ~ 100.1 or More-
      Feeding MethodHandlesFeed Screw
      Guiding MechanismPantograph-
      Table MaterialAluminum AlloySteel
      Table Surface TreatmentBlack AnodizeLow Temperature Black Chrome

      Loading...

      1. 1

      Related Categories to Manual Z-Axis Stages