(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 7:00 p.m. 2/22 to 5:00 p.m. (CST) 2/23/2025. We apologize for the inconvenience.

Suruga Seiki Manual Goniometer Stages(Guiding Mechanism:Cross Roller)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 47 Days or Less
  • 78 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Goniometer Axis
Travel (Range)(mm)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Overall Height H (Range)(mm)
Feeding Method
Center of Rotation Height (Range)(mm)
Guiding Mechanism
Table Material
Table Surface Treatment

    2-Axis Crossed Roller Goniometer Stage, Micrometer (B59)

      Manual Goniometer Stages - 1-Axis, Crossed Roller Guide, Worm Gear, B56

        Manual Goniometer Stages - 1-Axis, Crossed Roller Guide, Micrometer, B58

          2-Axis Crossed Roller Goniometer Stage, Worm Gear (B57)

          Brand

          Suruga Seiki

          Suruga Seiki

          Suruga Seiki

          Suruga Seiki

          Product Series

          2-Axis Crossed Roller Goniometer Stage, Micrometer (B59)

          Manual Goniometer Stages - 1-Axis, Crossed Roller Guide, Worm Gear, B56

          Manual Goniometer Stages - 1-Axis, Crossed Roller Guide, Micrometer, B58

          2-Axis Crossed Roller Goniometer Stage, Worm Gear (B57)

          CAD
          • 2D / 3D
          • 2D / 3D
          • 2D / 3D
          • 2D / 3D
          Days to Ship 8 Days or more 8 Days or more 8 Days or more 11 Days or more
          Goniometer Axis----
          Travel (Range)(mm)-Up to ±10-Up to ±10
          Load Capacity (Range)(N)5 to 30 / 30.1 to 505 to 30 / 30.1 to 505 to 30 / 30.1 to 505 to 30 / 30.1 to 50
          Table Size (Length) L (Range)(mm)26 to 40 / 41 to 60 / 61 to 9041 to 60 / 61 to 9026 to 40 / 41 to 60 / 61 to 9041 to 60 / 61 to 90
          Table Size (Width) W (Range)(mm)26 to 40 / 41 to 60 / 61 to 9041 to 60 / 61 to 9026 to 40 / 41 to 60 / 61 to 9041 to 60 / 61 to 90
          Overall Height H (Range)(mm)35.1 to 40 ~ 50.1 to 6015.1 to 20 ~ 25.1 to 3015.1 to 20 ~ 25.1 to 3035.1 to 40 ~ 50.1 to 60
          Feeding MethodMicrometer HeadsWorm GearsMicrometer HeadsWorm Gears
          Center of Rotation Height (Range)(mm)35.1 to 40 ~ 90.1 to 10040.1 to 50 ~ 100.1 or More35.1 to 40 ~ 100.1 or More40.1 to 50 ~ 90.1 to 100
          Guiding MechanismCross RollerCross RollerCross RollerCross Roller
          Table MaterialAluminumAluminum / BrassAluminumAluminum / Brass
          Table Surface TreatmentBlack Anodize / Clear AnodizeBlack Anodize / Clear Anodize / Nickel ChromeBlack Anodize / Clear AnodizeClear Anodize / Nickel Chrome

          Loading...

          1. 1

          Related Categories to Manual Goniometer Stages