(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Suruga Seiki Manual Z-Axis Stages(Guiding Mechanism:Lab Jacks)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 22 Days or Less
  • 23 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Stage Surface Orientation
Travel (Range)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Table Size (Thickness) H (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual Z-Axis Stages - Laboratory Jack (B35)

    Brand

    Suruga Seiki

    Product Series

    Manual Z-Axis Stages - Laboratory Jack (B35)

    CAD
    • 2D / 3D
    Days to Ship 8 Days or more
    Stage Surface OrientationHorizontal
    Travel (Range)±10 to 30mm / ±30mm or More
    Load Capacity (Range)(N)50.1 to 100
    Table Size (Length) L (Range)(mm)91 to 120 ~ 121 or More
    Table Size (Width) W (Range)(mm)61 to 90 ~ 91 to 120
    Table Size (Thickness) H (Range)(mm)50.1 to 60 ~ 80.1 to 100
    Feeding MethodHandles
    Guiding MechanismLab Jacks
    Table MaterialAluminum
    Table Surface TreatmentBlack Anodize

    Loading...

    1. 1

    Related Categories to Manual Z-Axis Stages