(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Suruga Seiki Manual X-Axis Stages(Table Material:Brass)

Days to Ship
  • All
  • Same day
  • 8 Days or Less
  • 9 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 15 Days or Less
  • 18 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Travel (Range)
Load Capacity (Range)(N)
Table Length L (Range)(mm)
Table Width W (Range)(mm)
Overall Height (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual X-Axis Stages - Dovetail, Feed Screw, Short Lead, B08/BDBXS/BDBXR

      Manual X-Axis Stages - Dovetail, Rack and Pinion, B05/B06

      Brand

      Suruga Seiki

      Suruga Seiki

      Product Series

      Manual X-Axis Stages - Dovetail, Feed Screw, Short Lead, B08/BDBXS/BDBXR

      Manual X-Axis Stages - Dovetail, Rack and Pinion, B05/B06

      CAD
      • 2D / 3D
      • 2D / 3D
      Days to Ship 8 Days or more 8 Days or more
      Travel (Range)Up to ±10mmUp to ±10mm
      Load Capacity (Range)(N)5 to 30 / 30.1 to 505 to 30
      Table Length L (Range)(mm)Up to 25 ~ 41 to 60Up to 25
      Table Width W (Range)(mm)Up to 25 ~ 41 to 60Up to 25
      Overall Height (Range)(mm)1 to 15 ~ 20.1 to 2515.1 to 20
      Feeding MethodFeed ScrewRack & Pinion
      Guiding MechanismDovetail SlideDovetail Slide
      Table MaterialBrassBrass
      Table Surface TreatmentBlack OxideBlack Oxide

      Loading...

      1. 1

      Related Categories to Manual X-Axis Stages