(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 7:00 p.m. 11/23/2024 to 5:00 p.m. (CST) 11/24/2024. We apologize for the inconvenience.

NBK Manual Z-Axis Stages(Stage Surface Orientation:Vertical)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 22 Days or Less
  • 23 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Stage Surface Orientation
Travel (Range)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Table Size (Thickness) H (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual Z-Axis Stages - Dovetail, Rack & Pinion, TAR

    Brand

    NBK

    Product Series

    Manual Z-Axis Stages - Dovetail, Rack & Pinion, TAR

    CAD
    • 2D / 3D
    Days to Ship 11 Days or more
    Stage Surface OrientationVertical
    Travel (Range)Up to ±10mm
    Load Capacity (Range)(N)5 to 30
    Table Size (Length) L (Range)(mm)41 to 60
    Table Size (Width) W (Range)(mm)Up to 25
    Table Size (Thickness) H (Range)(mm)-
    Feeding MethodRack & Pinion
    Guiding MechanismDovetail Slide
    Table MaterialBrass
    Table Surface TreatmentLow Temperature Black Chrome

    Loading...

    1. 1

    Related Categories to Manual Z-Axis Stages