(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Days to Ship |
|
---|
Manual XY-Axis Stages - Dovetail, Low Cost, XYMB
Miruc Optical
Cost is effectively reduced via a reduction in parts quantity and man-hours.
Days to Ship: | 13 Days or more |
---|
Brand |
---|
Product Series |
CAD |
Days to Ship |
Travel (X Distance) Range(mm) |
Travel (Y Distance) Range(mm) |
Load Capacity (Range)(N) |
Table Size (Length) L (Range)(mm) |
Table Size (Width) W (Range)(mm) |
Table Size (Thickness) H (Range)(mm) |
Feeding Method |
Guiding Mechanism |
Table Material |
Table Surface Treatment |
Brand | Miruc Optical |
---|---|
Product Series | |
CAD |
|
Days to Ship | 13 Days or more |
Travel (X Distance) Range(mm) | - |
Travel (Y Distance) Range(mm) | - |
Load Capacity (Range)(N) | - |
Table Size (Length) L (Range)(mm) | - |
Table Size (Width) W (Range)(mm) | - |
Table Size (Thickness) H (Range)(mm) | 35.1 to 40 |
Feeding Method | Rack & Pinion |
Guiding Mechanism | Dovetail Slide |
Table Material | Aluminum Alloy |
Table Surface Treatment | Black Anodize |
Loading...
The height is from the bottom to the top of the mounting surface. The micrometer head is not counted for the measurement.
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy