(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Chuo Precision Industrial Manual XYZ-Axis Stages(Guiding Mechanism:Dovetail Slide)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Stage (Z) Surface Orientation
Travel (X Distance) Range(mm)
Travel (Y Distance) Range(mm)
Travel (Z Distance) Range(mm)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Overall Height (H) (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual XYZ-Axis Stages - Dovetail

      Manual XYZ-Axis Stages - Mechanical Stand, Horizontal Z-Axis

        Manual XYZ-Axis Stages - Mechanical Stand, Small

        Brand

        Chuo Precision Industrial

        Chuo Precision Industrial

        Chuo Precision Industrial

        Product Series

        Manual XYZ-Axis Stages - Dovetail

        Manual XYZ-Axis Stages - Mechanical Stand, Horizontal Z-Axis

        Manual XYZ-Axis Stages - Mechanical Stand, Small

        CAD
        • 2D / 3D
        • 2D / 3D
        • 2D / 3D
        Days to Ship 8 Days or more 8 Days or more 8 Days or more
        Stage (Z) Surface Orientation---
        Travel (X Distance) Range(mm)---
        Travel (Y Distance) Range(mm)---
        Travel (Z Distance) Range(mm)---
        Load Capacity (Range)(N)5 to 3030.1 to 501 to 4.9
        Table Size (Length) L (Range)(mm)---
        Table Size (Width) W (Range)(mm)---
        Overall Height (H) (Range)(mm)---
        Feeding Method---
        Guiding MechanismDovetail SlideDovetail SlideDovetail Slide
        Table MaterialAluminum AlloyAluminum AlloyAluminum Alloy
        Table Surface TreatmentBlack AnodizeBlack AnodizeBlack Anodize

        Loading...

        1. 1

        Related Categories to Manual XYZ-Axis Stages