(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Chuo Precision Industrial Manual Z-Axis Stages(Table Material:Brass)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 22 Days or Less
  • 23 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Stage Surface Orientation
Travel (Range)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Table Size (Thickness) H (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual Z-Axis Stages - Screw Actuated, Dovetail or Ball Slide, High retention clamp

    Brand

    Chuo Precision Industrial

    Product Series

    Manual Z-Axis Stages - Screw Actuated, Dovetail or Ball Slide, High retention clamp

    CAD
    • 2D / 3D
    Days to Ship 8 Days or more
    Stage Surface OrientationVertical
    Travel (Range)-
    Load Capacity (Range)(N)1 to 4.9 / 5 to 30
    Table Size (Length) L (Range)(mm)26 to 40 ~ 41 to 60
    Table Size (Width) W (Range)(mm)Up to 25
    Table Size (Thickness) H (Range)(mm)-
    Feeding MethodFeed Screw
    Guiding MechanismDovetail Slide
    Table MaterialBrass
    Table Surface TreatmentLow Temperature Black Chrome

    Loading...

    1. 1

    Related Categories to Manual Z-Axis Stages