(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

Chuo Precision Industrial Manual Z-Axis Stages(Travel (Range):±10 to 30mm)

Days to Ship
  • All
  • 8 Days or Less
  • 10 Days or Less
  • 11 Days or Less
  • 12 Days or Less
  • 13 Days or Less
  • 18 Days or Less
  • 22 Days or Less
  • 23 Days or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Stage Surface Orientation
Travel (Range)
Load Capacity (Range)(N)
Table Size (Length) L (Range)(mm)
Table Size (Width) W (Range)(mm)
Table Size (Thickness) H (Range)(mm)
Feeding Method
Guiding Mechanism
Table Material
Table Surface Treatment

    Manual Z-Axis Stages - Dovetail, Rack & Pinion

    Brand

    Chuo Precision Industrial

    Product Series

    Manual Z-Axis Stages - Dovetail, Rack & Pinion

    CAD
    • 2D / 3D
    Days to Ship 8 Days or more
    Stage Surface OrientationVertical
    Travel (Range)±10 to 30mm
    Load Capacity (Range)(N)5 to 30
    Table Size (Length) L (Range)(mm)26 to 40
    Table Size (Width) W (Range)(mm)26 to 40 ~ 61 to 90
    Table Size (Thickness) H (Range)(mm)-
    Feeding MethodRack & Pinion
    Guiding MechanismDovetail Slide
    Table MaterialAluminum Alloy
    Table Surface TreatmentBlack Anodize

    Loading...

    1. 1

    Related Categories to Manual Z-Axis Stages